Soon
after the completion of electrical rough-ins, the plumbing rough-ins were
completed.
The
cladding (Scyon Linea weatherboard) on the front, side and rear sides on the
first floor is completed too – you can see in the pictures below cladding details
such as corners fixed with vertical timber pieces and metal capping.
Although
the Boral plaster boards were delivered mid-week, the wall insulation
will need to be completed first before the plaster is hung. I hope the wait is
not too long, as there no signs yet of insulation materials on
site.